Project

General

Profile

Bug #23

Mirror rotation

Added by Igor Lazbin almost 6 years ago. Updated over 5 years ago.

Status:
Resolved
Priority:
Normal
Assignee:
Start date:
01/15/2019
Due date:
% Done:

0%

Estimated time:

Description

While running a Comprehensive Performance Test (CPT) for the record, while installed on the Spacecraft (at LASP), the instrument exhibited an anomalous behavior. The pointing mirror assembly performed an unexpected rotation after the SC Status Watchdog was enabled (Section 4.3.1, Step aaa). Similar behavior was exhibited during aliveness testing, after SC Safe Bit was set (=1, safed), while the mirror was at home.

History

#1 Updated by Igor Lazbin almost 6 years ago

  • Status changed from New to In Progress

#2 Updated by Igor Lazbin over 5 years ago

  • Status changed from In Progress to Resolved

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 97.7 MB)